Quick Links
Skip to main contentSkip to navigation

Heartland Community Schools

News

Working...

Ajax Loading Image

 

School Entrance During The Summer

Now that the school year is over, construction on the main entrance and office area will begin.  As a result of this construction work, the main entrance on the south side of the building will be closed for the summer months.  Office personnel have been relocated for the summer as well.

The building entrance that will be used for the summer months is entrance #23 which is located on the west side of the building. This is the same entrance that was used to enter the building for home games during this year's basketball season.

Office personnel have been relocated to the high school library for the summer months.  The high school library can be easily found by entering the building through entrance #23 and walking straight down the hallway.  The high school library will be on your left as you walk down the hallway.